Membrane Wall Fabrication


In order to ensure the membrane wall panel dimension and welding beams quality, Pourin independently developed membrane wall panel machines, locates the tube and fin separately in the welding process, so as to make the membrane wall panel dimensions, e.g. the linear misalignment, length, pitch, straightness and flatness can be controlled in high precision. Operated by our professional technicians and engineers, the membrane water wall panel welding process are stable with smooth welding beams.

Header Fabrication


Pourin’s header production line has equipped with all kinds of drilling machines, CNC machining centers, automatic beveling machines, automatic welding equipment, combined with rich welding experience, to provide customers with high quality headers.

Superheater /Reheater/Economizer Fabrication


Pourin is equipped with a complete set of high automation and precision coil production lines including: tube end pretreatment, three-dimensional storage storehouse, straight pipe butt welding machine, flaw detection system, pipe bending platform, controlling good quality of tube ovality and thickness thinning.

Project:Inconel overlay for SUPERHEATER tubes and HEADER tubes for Covanta US,


Project:Inconel overlay for SUPERHEATER tubes and HEADER tubes for Covanta US, overaly material is INCONEL 625, overlay thickness is 1.8 mm,overlay area is 344.5 ㎡;on time delivered on December 14th 2

Project:Inconel overlay for upper side wall and upper rear wall panels for Covanta US,


Project:Inconel overlay for upper side wall and upper rear wall panels for Covanta US, overaly material is INCONEL 625, overlay thickness is 1.8 mm,overlay area is 352 ㎡;on time delivered on January 2

Project:Superheater and reheater at Duke Energy Group's Belews Creek station in USA.


Project:Superheater and reheater at Duke Energy Group's Belews Creek station in USA. Overlay material--Inconel 622, overlay thickness--1.78mm, overlay area--2044+m2 (11330m), delivery date--Jan 26, 20

Project:Superheater and reheater of CFB boiler at Calaca station in Philippine.


Project:Superheater and reheater of CFB boiler at Calaca station in Philippine. Overlay material--Inconel 622, overlay thickness--1.78mm, overlay area--72+m2 (400m), delivery date--Nov 20, 2018.

Project:Finish superheater of biomass boiler at Forestalia Group's Cubillos station in Spain.


Project:Finish superheater of biomass boiler at Forestalia Group's Cubillos station in Spain. Overlay material--Inconel 625, overlay thickness--0.8mm, overlay area--508+m2 (2850m), delivery date--July

Delivered overlay panels to Oschatz, used for cooling stack for waste-heat recovery of steel-making at ArcelorMittal's plant in Aviles, Spain.


Delivered overlay panels to Oschatz, used for cooling stack for waste-heat recovery of steel-making at ArcelorMittal's plant in Aviles, Spain. Overlay material--Inconel 625, overlay thickness--2.0mm,